C.M.
These (2) wells have the new 60’ Predator X-6 Separators. The ‘xx09’ was installed about 40 days ago and a Request has been made to speed up the SPM. “First time in our history“. The x02 has been in the hole for about 15 days and run time is climbing 2-4 points per day as the fluid level comes down.